Pforzheim Central Station

Pforzheim Hauptbahnhof
Operations
Category 3
Type Through station
Platforms in use 7
Daily entry/exit ca. 50,000 daily
DS100 code TPH
Construction and location
Opened 4 July 1861
Architect Helmuth Conradi
Location Pforzheim
State Baden-Württemberg
Country Germany
Home page bahnhof.de
Route information
List of railway stations in Baden-Württemberg

Pforzheim Central Station (German: Pforzheim Hauptbahnhof) is the main station in the city of Pforzheim in the German state of Baden-Württemberg.

Contents

Rail services

Pforzheim Hauptbahnhof is served by several lines operated at regular intervals, including an Interregio-Express/ Regional-Express line, a Regionalbahn line and two Karlsruhe Stadtbahn lines. It is of minor importance for long-distance transport: only one InterCity service operates at two houly intervals along with a pair of EuroNight services.

Long distance

In the early 1990s Pforzheim Hauptbahnhof lost its importance for long-distance traffic as a result of the construction of the Mannheim–Stuttgart high-speed railway. High-speed trains now run between Karlsruhe and Stuttgart via Bruchsal.

Line Route Frequency
IC 61 (Basel) – KarlsruhePforzheimStuttgartNuremberg Every two hours

Regional and suburban railway traffic

Line Route Frequency
IRE R5 Stuttgart – Vaihingen (Enz)Mühlacker – Pforzheim – Karlsruhe Every two hours
RE R5 Stuttgart – Bietigheim-Bissingen – Vaihingen (Enz) – Mühlacker – Pforzheim – Karlsruhe Every two hours
RB R52 PforzheimCalwNagold (Stadt)Horb – (Tübingen); over the Nagold Valley Railway Pforzheim – Nagold: every 30 mins
Nagold – Horb: hourly
Horb – Tübingen: two-hourly
S 5 Wörth – Knielingen – Karlsruhe Marktplatz – Durlach – Pforzheim – Mühlacker – Vaihingen (Enz) – Bietigheim-Bissingen Every 30 mins with additional trains in the peak
S 6  PforzheimNeuenbürgBad Wildbad; over the Enz Valley Railway Every 30 mins

Rehabilitation of station

On 27 February 2009, the basic rehabilitation of the station was approved. This includes the raising of platforms from 38 to 55 cm and the installation of lifts. The renovation of the station building is included in this package. Specifically, € 1.8 million euro is provided for the barrier-free access (2 lifts and a ramp), € 4 million for the raising of the platforms and € 700,000 for the renovation of the building. The renovation began at the end of 2010.[1]

References

  1. ^ "Baustart für Hauptbahnhof nächste Woche" (in German). Pforzheimer Zeitung. 26 January 2011. http://www.pz-news.de/Home/Nachrichten/Pforzheim/arid,245687_puid,1_pageid,17.html. Retrieved 29 January 2011. 

External links